Sports Center Specialists (branch of the center of exploitation of ground-based space infrastructure, is included in the state corporation “Roskosmos”) adopted the railway composition with the Blocks of the Soyuz-2.1b missile and the head fairing. Echelon arrived at the Tyurats railway station in Kazakhstan.
Head fairing container is transported to storage in the installation and test case No. 112 of the Baikonur cosmodrome. The blocks of the carrier rocket delivered to the site number 31 and are unloaded into the workplace. In accordance with a comprehensive schedule of work, the staffing of the carrier missile will begin on December 9, 2021.
Start of the Soyuz-2.1b media missile with an overclocking unit “Frigate” and OneWeb spacecraft within mission number 37 is scheduled for the end of December from the starting complex “Vostok” platform number 31 of the Baikonur cosmodrome.