In accordance with a comprehensive training schedule, specialists of the South Space Center (branch center of exploitation of land-based space infrastructure facilities) and a branch of the Progress Rocket and Space Center (included in the state corporation “Roskosmos”) completed the mechanical assembly of the Package (1 and 2 steps) Soyuz-2.1A carrier missiles.
Assembly operations were carried out in the installation and test case of the technical package of the site No. 31. After their completion, the joint settlement of specialists of Roskosmos subsidiaries was performed by the storage unit to the storage unit.
Simultaneously at the technical complex of the site No. 254, the preparation of the transport piloted ship “Union MS-19” continues. Work has already been performed on verifying the parameters of the “course” system in the non-echo chamber. Currently on the ship is carried out test inclusions of systems.
The launch of the piloted ship “Union MS-19” is scheduled for the beginning of October from the starting complex “East” platform number 31 of the Baikonur cosmodrome.