In NGO Energomash develop high-tech production

In the Scientific and Production Association “Energomash” named after Academician V.P. Glushko was discovered after the large-scale reconstruction of the electro-ration site of the assembly and welding shop. Prior to repair, the electric-erosion plot was located in a workshop remote from the workshop, which requires capital repairs, which created difficulties with logistics and maintaining the required level of production culture.

After commissioning a new section, the above problems will disappear, which, in turn, will have a positive effect on the efficiency of production. At the newly created area, which is directly in the territory of the workshop, the engineering systems are fully replaced: power supply, water supply, lighting, ventilation. Equipped with the latest fire extinguishing system, uninterruptible power sources, which is especially relevant when using electric erosion equipment. The production process has become more secure and relevant modern requirements.

In addition to production, reconstruction touched upon administrative and auxiliary premises: IRC, technical; Organized room reception room. As the general director of NGO Energomash, Igor Watermelov, the resulting result – the result of the complex work of all enterprise services: and production and engineering and, those who are engaged in construction: “This is another step in creating a comfortable work environment, qualified jobs, high-tech experienced workplaces production. “

The importance for the production of rocket engines of this site is difficult to overestimate – here the complex surfaces of the parts are created on the electro-erosion equipment, which are problematic or cannot be reproduced by means of mechanical processing equipment. For example, the manufacture of channels that determine the profile of the blades of the impeller of the turbine or a nozzle apparatus, the effect of high density of high density to the workpiece using an electrode that is a tool.

Repair work was carried out on schedule, strictly regulating each stage of the work performed.

/Media reports.